公司英语_tiny_新浪博客

公  司  英 
一、组织机构及职位
XX电子有限公司XX Electronics CO., Ltd
总经理办公室General manager’s office
企管部Enterprise management department (EM)
行政部Administration department (AD)
销售部Sales department (SD)
财务部Financial department (FD)
技术部Technology department (TD)
物控部Production material control department (PMC)
生产部Production department(PD)
模具部Mold manufacturing department, Tooling manufacturing department (TM)
品管部Quality Assurance department (QA)
冲压车间Stamp workshop, press workshop
注塑车间injection workshop
装配车间Assembly workshop
模具装配车间Mold and die Assembly workshop
金属加工车间Metal machine workshop
电脉冲车间Electric discharge process workshop
线切割车间wire cutting process workshop
工磨车间Grinding workshop
总经理General manager (GM)
副总经理Vice-general manager
经理manager
董事长president
副董事长Vice-president
XX部门经理Manager of XX department
主任、主管supervisor
拉长Line leader
组长Foreman, forelady
秘书secretary
文员clerk
操作员operator
助理assistant
职员staff

二、产品
连接器connector
端子terminal
条型连接器bar connector
阴连接器Housing
阳连接器wafer
线束wire harness
间距space
额定电压 rated voltage
额定电流 rated current
接触电阻contact resistance
绝缘电阻insulation resistance
超声波焊接ultrasonic welding
耐压withstand voltage
针pin
物料编号part number
导线wire
基体金属Base metal
电缆夹cable clamp
倒角chamfer
接触面积contact area
接触件安装孔contact cavity
接触长度contact length
接触件电镀层contact plating
接触压力contact pressure
接触件中心距contact space
接触簧片contact spring
插孔socket contact
法兰、凸缘Flange
界面间隙interfacial gap
键Key
键槽keyway
过渡段ramp
屏蔽套shielding
定位基准Datum reference
扁平电缆flat cable ,Ribbon cable
柔性印刷电线Flexible printed wiring
多层印制电路Multilayer printed circuit
焊盘pad
图形pattern
间距pitch
负极Negative pole
正极positive pole
回流Reflow
原理图Schematic diagram
单面板single sided board
双面板Two-sided board,Double-sided board
表面安装surface Mounting
翘曲warp, bow
波峰焊wave soldering
编织层braid
同轴电缆coaxial cable
电介质dielectric
电缆中导线的头数ends
外部干扰external interference
填充物filler
护套jacket
比重specific gravity
电阻的温度系数Temperature coefficient of resistance
三、模具
塑料模具mould of plastics
注塑模具injection mould
冲压模具die
模架mould base
定模座板Top clamping plate
Top plate
Fixed clamp plate
水口推板stripper plate
A板A plate
B板B plate
支承板 support plate
方铁 spacer plate
底针板 ejector plate
面针板 ejector retainer plate
回针 Return pin
导柱 Guide pin
有托导套 Shoulder Guide bush
直导套 Straight Guide bush
动模座板Bottom clamp plate
Moving clamp plate
基准线datum line
基准面datum plan
型芯固定板core-retainer plate
凸模固定板punch-retainer plate
顶针ejector pin
单腔模具single cavity mould
多腔模具multi-cavity mould
多浇口multi-gating
浇口gate
缺料starving
排气breathing
光泽gloss
合模力mould clamping force
锁模力mould locking force
挤出extrusion
开裂crack
循环时间cycle time
老化aging
螺杆screw
麻点pit
嵌件insert
活动镶件movable insert
起垩chalking
浇注系统feed system
主流道 sprue
分流道runner
浇口gate
直浇口direct gate ,  sprue gate
轮辐浇口spoke gate ,  spider gate
点浇口pin-point gate
测浇口edge gate
潜伏浇口submarine gate ,  tunnel gate
料穴cold-slug  well
浇口套sprue bush
流道板runner plate
排飞槽vent
分型线(面)parting line
定模stationary mould,Fixed mould
动模movable mould, movable half
上模upper mould,   upper half
下模lower mould,   lower half
型腔cavity
凹模cavity plate,cavity block
拼块split
定位销dowel
定位销孔dowel hole
型芯core
斜销angle pin,  finger cam
滑块slide
滑块导板slide guide strip
楔紧块heel block, wedge lock
拉料杆sprue puller
定位环locating ring
冷却通cooling channel
脱模斜度draft
滑动型芯slide core
螺纹型芯threaded core
热流道模具hot-runner mould
绝热流道模insulated runner mould
熔合纹weld line (flow line)
三板式模具three plate mould
脱模ejection
换模腔模具 interchangeable cavity mould
脱模剂release agent
注射能力shot capacity
注射速率injection rate
注射压力injection pressure
差色剂colorant
保压时间holdup time
闭模时间closing time
定型装置sizing system
阴模female mould,cavity block
阳模male mould
电加工设备Electron Discharge Machining
数控加工中心CNC machine center
{wn}铁床Universal milling machine
卧式刨床Horizontal planer
车床Engine lathe
平面磨床Surface grinding machine
去磁机Demagnetization machine
{wn}摇臂钻床Universal radial movable driller
立式钻床Vertical driller
超声波清洗机Ultrasonic clearing machine
四、品管
SPC statistic process control
品管保证Quality Assurance
品管控制Quality control
来料检验IQC Incoming quality control
巡检IPQC In-process quality control
校对calibration
动态试验dynamic test
环境试验Environmental test
非破坏性试验non-destructive test
光泽gloss
击穿电压(dielectric) breakdown voltage
拉伸强度tensile strength
冷热骤变试验thermal shock test
环境试验炉Environmental chamber
盐雾实验salt spray test
绝缘电阻测试验仪Insulating resistance meter
内应力internal stress
疲劳fatigue
蠕变creep
试样specimen
撕裂强度tear strength
缩痕shrink mark, sink mark
耐久性durability
抽样sampling
样品数量sample size
AQL Acceptable Quality level
批量lot size
抽样计划sampling plan
OC曲线operation curve
试验顺序sequence of tests
环境温度ambient temperature
可焊性solderability
阻燃性flame resistance
五、生产
注塑机injection machine
冲床Punch machine
混料机blender mixer
尼龙nylon
黄铜 brass
青铜 bronze
紫(纯)铜 copper
料斗hopper
麻点pit
配料compounding
涂层coating
飞边flash
预热preheating
再生料reworked material
再生塑料reworked plastics
工艺设计process design
紧急停止emergency stop
延时time delay
六.物控
保质期shelf life
ABC分类法ABC Classification
反常需求Abnormal Demand
措施信息Action Message
活动报告标志Action-report-flag
基于活动的成本核算Activity-based Costing (ABC)
实际能力Actual Capacity
实际成本Actual Costs
调整现有库存量Adjust-on-hand
已分配量Allocation  
替代工序Alternative Routine  
装配订单Assembly Order  
装配零件表Assembly Parts List  
装配Assembly  
计划自动重排Automatic Rescheduling  
可达到库存Available Inventory  
可用材料Available Material  
达到库存Available Stock  
可利用工时Available Work  
可签约量Available-to-promise  
平均库存Average Inventory  
欠交订单Back Order  
倒序计划Back Scheduling  
倒冲法Back flush  
未完成订单Backlog  
现有库存余额Balance-on-hand Inventory  
批号Batch Number  
批量生产Batch Production  
标杆瞄准Benchmarking  
工时清单Bill of Labor  
提货单Bill of Lading  
物料清单Bill of Material  
分库Branch Warehouse  
经营规划Business Plan  
采购员Buyer  
能力管理Capacity Management  
能力需求计划Capacity Requirements Planning (CRP)  
保管费率Carrying Cost Rate
保管费Carrying Cost  
单元式制造Cellular Manufacturing  
修改批量日期Change Lot Date  
修改工序Change Route  
修改产品结构Change Structure
检查点Check Point  
闭环物料需求计划Closed Loop MRP  
通用工序标识Common Route ID  
计算机集成制造Computer-integrated Manufacturing (CIM)  
配置代码Configuration Code  
约束管理/约束理论Constraints Management/Theory of Constraints (TOC)  
依成本的材料清单Costed Bill of Material  
急需零件Critical Part  
累计提前期Cumulative Lead Time  
现有运转时间Current Run Hour  
现有运转数量Current Run Quantity  
周期盘点Cycle Counting  
调整日期Date Adjust  
有效日期Date Available  
修改日期Date Changed  
结束日期Date Closed  
截止日期Date Due  
生产日期Date in Produced  
库存调整日期Date Inventory Adjust  
作废日期D ate Obsolete  
收到日期Date Received  
交付日期Date Released  
需求日期Date Required  
发货日期Date to Pull  
空负荷Dead Load  
需求管理Demand Management  
需求Demand  
实际能力Demonstrated Capacity  
非独立需求Dependent Demand  
直接增减库存处理法Direct-deduct Inventory Transaction Processing  
发料单Disbursement List  
派工单Dispatch List  
分销资源计划Distribution Resource Planning (DRP)  
鼓-缓冲-绳子Drum-buffer-rope  
经济订货批量Economic Order Quantity (EOQ)  
工程变更生效日期Engineering Change Effect Date  
工程变更生效单Engineering Change Effect Work Order  
工程停止日期Engineering Stop Date  
例外控制Exception Control  
呆滞材料分析Excess Material Analysis  
急送代码Expedite Code  
加工订单Fabrication Order  
补足欠交Fill Backorder  
总装提前期Final Assembly Lead Time  
确认的计划订单Firm Planned Order  
固定订货批量F ixed Order Quantity  
集中预测Focus Forecasting  
xx跟踪Full Pegging  
通用生产管理原则Generally Accepted Manufacturing Practices  
毛需求Gross Requirements  
在制品库存In Process Inventory  
独立需求Independent Demand  
投入/产出控制Input/ Output Control
检验标识Inspection ID  
厂际需求Interplant Demand
库存周转率Inventory Carry Rate  
仓库库位类型Inventory Location Type  
库存周转次数Inventory Turnover  
发送订单Issue Order  
项目记录Item Record  
物料项目Item  
加工车间Job Shop  
准时制生产Just-in-time (JIT)  
看板Kanban  
人工工时Labor Hour  
{zh1}运输日期Last Shipment Date  
提前期Lead Time  
层Level  
负荷量Load Leveling  
负荷报告Load Report  
负荷Load  
仓位代码Location Code  
仓位备注Location Remarks  
仓位状况Location Status  
按需订货Lot for Lot  
批量标识Lot ID  
批量编号Lot Number  
批量Lot Size  
低位码Low Level Code
机器能力Machine Capacity
机器加载Machine Loading  
外购或自制决策Make or Buy Decision  
面向订单生产的产品Make-to-order Product  
面向库存生产的产品Make-to-stock Product  
制造周期时间Manufacturing Cycle Time  
制造资源计划Manufacturing Resource Planning (MRP II)  
主生产计划Master Production Schedule (MPS)  
物料成本Material Cost  
物料发送和接收Material Issues and Receipts  
物料需求计划Material Requirements Planning (MRP)  
登陆标志MPS Book Flag  MPS
多重仓位Multiple Location  
净改变式MRP N et Change MRP 
净需求Net Requirements  
新仓位New Location  
新组件New Parent  
新仓库New Warehouse  
不活动报告No Action Report  
现有库存量On-hand Balance  
未结订单Open Order  
订单输入Order Entry  
订货点Order Point  
订货方针Order Policy  
订货承诺Order Promising  
订货备注Order Remarks  
双亲Parent  
零件清单Part Bills  
零件批次Part Lot  
零件编号Part Number  
零件Part  
反查Pegging  
领料单Picking List  
领料/提货Picking  
计划订单Planned Order  
后减库存处理法Post-deduct Inventory Transaction Processing  
前减库存处理法Pre-deduct Inventory Transaction Processing  
xx价格Price Invoice  
采购订单价格Price Purchase Order  
优先计划Priority Planning  
产品控制Product Control  
产品线Production Line  
生产规划编制Production Planning  
产品率Production Rate  
产品结构树Production Tree  
预计可用库存Projected Available Balance  
采购订单跟踪Purchase Order Tracking  
已分配量Quantity Allocation  
仓位数量Quantity At Location  
欠交数量Quantity Backorder  
完成数量Quantity Completion  
需求量Quantity Demand  
毛需求量Quantity Gross  
进货数量Quantity In  
排队时间Queue Time  
队列Queue  
重生成式MRP  Regenerated MRP 
重排假设Rescheduling Assumption  
资源需求计划Resource Requirements Planning  
粗能力计划Rough-cut Capacity Planning  
工艺路线Routing  
安全库存量Safety Stock  
保险期Safety Time  
预计入库量Scheduled Receipt  
残料率Scrap Factor  
发送零件Send Part  
维修件Service Parts  
发货地址Ship Address  
发货单联系人Ship Contact  
发货零件Ship Date  
发货单Ship Order  
工厂日历Shop Calendar  
车间作业管理Shop Floor Control  
损耗系数Shrinkage Factor  
标准产品成本Standard Product Cost  
标准机器设置工时Standard Set Up Hour  
标准单位运转工时Standard Unit Run Hour  
标准工资率Standard Wage Rate  
状况代码Status Code  
库存控制Stores Control  
建议工作单Suggested Work Order  
约束理论Theory of Constraints (TOC)  
时间段Time Bucket  
时界Time Fence  
单位成本Unit Cost  
采购计划员Vendor Scheduler  
采购计划法Vendor Scheduling  
工作中心能力Work Center Capacity  
工作中心Work Center  
在制品Work in Process  
工作令跟踪Work Order Tracking  
工作令Work Order  
工作进度安排Work Scheduling  
零库存Zero Inventories  
经济订货批量=Squat(2*年订货量*平均一次订货准备所发生成本/每件存货的年储存成本)
美国生产和库存控制协会APICS,American Production & Inventory Control Society 
七.QS-9000中的术语
APQP Advanced Product Quality  Planning and Control Plan,产品质量先期策划和控制计划
PPAP  Production Part Approval Process,生产件批准程序
FMEA Potential Failure Mode and Effects Analysis,潜在失效模式及后果分析
MSA  Measure System Analysis,测量系统分析
SPC Statistical Process Control,统计过程控制
审核 Audit
能力 Capability
能力指数 Capability Indices
控制计划 Control Plans
纠正措施 Corrective Action
文件 Documentation
作业指导书 Job Instruction, work instruction
不合格品 Nonconformance
不合格 Nonconformity
每百万零件不合格数 Defective Parts Per Million, DPPM
预防措施 Preventive Action
程序Procedures
过程流程图 Process Flow Diagram, Process Flow Chart
质量手册Quality Manual
质量计划 Quality Plan
质量策划 Quality Planning
质量记录Quality Records
原始数据Raw Data
反应计划Reaction Plan
返修Repair。
返工Rework
现场Site
分承包方Subcontractors
产品product
质量quality
质量要求quality requirement
顾客满意customer satisfaction
质量管理体系quality management system
质量方针quality policy
质量目标quality objective
质量管理quality management
质量控制quality control
质量保证quality assurance
组织organization
顾客customer
供方supplier
过程process
服务service
设计与开发design and development:
特性characteristic
可追溯性trace ability
合格conformity
缺陷defect
纠正correction
让步concession
放行release
报废scrap
规范specification
检验inspection
试验test
验证verification
评审review
测量measurement
计数型数据Attributes Data
普通原因Common Cause
单值Individual
均值Mean
随机抽样Random Sampling
极差Range
特殊原因Special Cause
稳定性Stability
子组Subgroup
计量型数据Variables Data
变差Variation
固有变差Inherent Variation
总变差Total Variation
偏倚Bias
重复性Repeatability
再现性Reproducibility
稳定性Stability
线性Linearity
分辨率Resolution
过程更改Process change
质量功能展开QFD
过程特殊特性Special Process Characteristic
产品特殊特性Special Product Characteristic
外观项目Appearance Item
初始过程能力Preliminary Process Capability
材料清单Bill of Material
设计确认Design Validation
设计验证Design Verification
顾客的呼声Voice of the Customer
过程的呼声Voice of the Process
八.常用缩略词语
1、ES   工程规范 Engineering Specification
2、KCC   关键控制特性(GM)Key Control Characteristic
3、KPC   关键产品特性(GM)Key Product Characteristic
4、OEM 整车厂 Original Equipment Manufacturer
5、SC重要(特殊)特性 Significant(Special) Characteristic
6、ANOVA 方差分析法 Analysis of Variance
7、CFT   多方论证小组 Cross function Team
8、DFMEA 设计失效模式及后果分析 Design Failure Mode and Effects Analysis
9、DOE   试验设计 Design of Experiment
10、DVP&R  设计验证计划和报告 Design verification Plan and Report
11、FTC   试生产能力 First Time Capability
12、GR&R  量具的重复性和再现性Gage Repeatability and Reproducibility
13、PFMEA 过程失效模式及后果分析Process Failure Mode and Effect Analysis
14、SFMEA 系统失效模式及后是分析 System Failure Mode and Effect Analysis
15、QSR   质量体系要求 Quality System Requirement
16、QFD   质量功能展开 Quality Function Deployment
17、TGR   运行情况良好 Things Gone Right
18、TGW   运行情况不良 Things Gone Wrong
19、VE/VA 价值工程/价值分析 Value Engineering/Value Analysis
20、BOM   物料清单 Bill of Material
21、Cpk    稳定过程的能力指数 Capability for stable process
22、LCL     下控制限 Lower Control Limit
23、UCL     上控制限 Upper Control Limit
24、LSL    工程规范下限 Lower Specification Limit
25、USL    工程规范上限 Upper Specification Limit
26、Ppk    性能指数 The performance index
27、MRB    物料评审 Material Review Board
28、PSW    零件提交保证书 Part Submission Warrant
29、X(—)--R图   均值一极差图 Average-Range Chart
30、SRPC    供方要求产品更改 Supplier Request for Product Change
31、SREA   供方工程批准的要求 Supplier Request for Engineering Approval
32、IAA   临时批准授权 Interim Approval Authorization
33、AAR   外观件批准报告 Appearance Approval Report
34、PTR   试生产(报告) Production Trial Run (Report)
35、DCP尺寸控制计划(动态控制计划)Dimension Control Plan (Dynamic Control Plan)
37、防错(POKA-YOKE)Mistake Proofing

郑重声明:资讯 【公司英语_tiny_新浪博客】由 发布,版权归原作者及其所在单位,其原创性以及文中陈述文字和内容未经(企业库qiyeku.com)证实,请读者仅作参考,并请自行核实相关内容。若本文有侵犯到您的版权, 请你提供相关证明及申请并与我们联系(qiyeku # qq.com)或【在线投诉】,我们审核后将会尽快处理。
—— 相关资讯 ——