SL3000我不知道,但其上一代原型机是FUHRLAENDER的FL1250。其发电机技术有两种,一种是异步双馈的,另一种是转速固定,不可调桨距,异步发电机,没有整流器的。估计SL3000也差不多。 东海大桥的3mw的塔筒壁厚50 大连重工集团旗下的华锐,获得了奥地利AMSC集团下属子公司Windtec制造1.5MW涡轮发电机的技术许可。这家公司也是胡苏姆国际风能展的展商。此外,这两家公司还合作研发了由德国船级社(Germanischer Lloyd)认证的3MW华锐SL3000发电机组--http://www.86wind.com/info/detail/2-7292.html 上海东海大桥100兆瓦海上风电示范项目位于杭州湾口东北部、上海市东海大桥东部海域,风电场海域范围距岸线8~
钢管表面防腐只做了一段,是否有其他如牺牲阳极金属一类的保护措施呢?有的,有工程承包商,采用了两个阳极块。
不xx浸入海水中的钢结构,在交变水线区腐蚀速度特别快,例如:插入海水中的钢桩,位于水面以上
a leading
energy technologies company, today announced that it has received an order worth more than $18 million for wind turbine electrical systems and core electrical components from Beijing-based Sinovel Wind Corporation Limited. Under the terms of the contract, AMSC will deliver these products to Sinovel over the next 15 months. The systems and components will be deployed in 3 megawatt (MW) wind turbines that have been developed under a contract initiated with AMSC Windtec, a wholly owned subsidiary of AMSC, approximately one year ago. 东海大桥近海风电场为中国{dy}个海上风电场,工程位于上海市东海大桥东部海域,总装机容量102MW,安装34台华锐风电科技有限公司生产的单机容量3MW的SL3000离岸型风电机组。风电场海域范围距离岸线8~13km。风电场布置最北端距离南汇嘴岸线 风机基础型式采用高桩混凝土承台,每个风机设置一个基础。基础分两节,下节为直径 风机塔架与基础承台连接段采用一个直径 |