原文:Add a flood of new equipment to bridge
, Shijiazhuang Railway Station is located north of the Zhongshan Lu Di bridge the formal end of Pump Station construction. The new pump station with automatic control technology, when the water level reaches a certain level, the drainage pump will automatically open.
It is reported that, Zhongshan Lu Di bridge is in the mountain's throat, the rainy season every year, once the water too deep, things will be completely blocked by traffic. Since last year, as "the railway into the earth" works, the original pump station was removed. After several months of construction, pump station, Zhongshan Lu Di bridge re-installed.
The new pump station with the automatic and manual control of a combination, when the water level inside the collection tank liquid level sensor alarm location, the drainage pump will automatically turn
原文来自: http://www.google.com.hk/news
原文:Add a flood of new equipment to bridge
原文:
;是由提供的阀门新闻,中文译文仅供参考(上海一环流体控制设备有限公司还生产
及活塞式缓闭止回阀,水封截止阀,铜角式截止阀,橡胶瓣止回阀,静音止回阀,欢迎您的选购。)
地道桥添加防汛新设备
,位于石家庄火车站北侧的中山路地道桥泵站施工正式结束。新泵站采用自动控制技术,当水位达到一定程度时,排水泵会自动开启。
据悉,中山路地道桥是中山路的咽喉,每年雨季,一旦积水过深,东西交通将会彻底阻断。去年以来,由于“铁路入地”工程的施工,原来的泵站被拆除。经过几个月的施工,中山路地道桥泵站重新安装完毕。
新泵站采用了自动控制和手动控制相结合的方式,当集水池内的水位达到液位传感器报警位置时,排水泵就会自动开启