一、泵必须安装在稳固的基础架或地基上,不应有松动。 二、起动前检查: 1、各连接部位要紧固; 2、电动旋转方向应正确; 3、离合器灵活可靠; 4、管路连接牢固,密封可靠,底阀灵活有效。 三、起动前,吸水管、底阀、泵体内必须注满引水,压力表缓冲器上端注满油。 四、用手转动,使活塞往复两次,无阻梗且线路绝缘良好时方可空载起动,起动后,待运转正常再逐步增加载荷。进口泵阀门工业洗衣机 五、运转中应注意各密封装置的密封情况,必要时加以 调整。拉杆及副杆要经常涂油润滑。 六、运转中经常测试泥浆含沙量不得超过10%。 七、有几档速度的泥浆泵为使飞溅润滑可靠,应在每班运转中将几档速度分别运转,时间均不少于30秒。 八、严禁在运转中变速,需变速时应停泵换档。 九、运转中出现异响或水重、压力不正常或有明显高温时应停泵检查。 十、在正常情况下应在空载时停泵。停泵时间较长时,必须全部打开放水孔,并松开缸盖,提起底阀放水杆,放尽泵体及管道中的全部泥砂。 十一、长期停用,应彻底清洗各部泥砂、油垢,将曲轴箱内润滑油放尽,并采取防锈、防腐措施。
“ Hardware Knowledge: mud pump safety operation ”是由提供的水泵行业新闻,译文仅供参考。另外,还提供相关产品搜索:、、、、等。
译文:
1, the pump must be installed on a solid foundation frame or foundation should not be loose. Second, starting before the examination: 1, the joints should be tightened; 2, the electric rotation should be correct; 3, flexible and reliable clutch; 4, pipe connections are secure, reliable seal, the bottom valve flexible and effective. Third, starting before the suction pipe, foot valve, pump water body must be filled, fill the upper buffer oil pressure gauge. 4, hand rotation, so that the piston back and forth twice, unfettered stem and load wiring insulation be a good start when, after starting, to be operating normally and then gradually increase the load. Imports of industrial washing machine valve gate 5, in operation should be notedthat the sealing device seals, if necessary, be adjusted. Deputy shot to tie and often painted oil lubrication. 6, running in the mud sediment tests often no more than 10%. 7, the speed of the mud several files to make splash lubrication for the reliable operation of each class will be a few files in the speed of operation, respectively, at all times not less than 30 seconds. 8, is strictly prohibited in the operation of speed, need speed gear pump should be stopped. 9, in operation there abnormal sound or water weight, pressure, abnormal or significant heat pump inspection should be stopped. 10, under normal circumstances should be empty when the pump stops. Longer when the pump stops, must be completely open escape hole, and release the cylinder head, bring the end of valve Drainage bar, pump and piping in place to do all the sediment. 11, long-term suspended sediment ministries should be thoroughly cleaned, grease, oil will be exhausted crankshaft box, and take the rust and corrosion protection.
原文来源: